New Horizon

ASHGHAL / BUZWAIR E & C IA 2016 C 013 GRIW for Junction & Roundabouts in Various Area of Greater Doha Phase 6 (Site Instruction No. 1 – Ali Bin Abi Taleb Street)

IA 2016 C 013 GRIW for Junction & Roundabouts in Various Area of Greater Doha Phase 6 (Site Instruction No. 1 – Ali Bin Abi Taleb Street)

no images were found

Client: ASHGHAL / BUZWAIR E & C

Brief Description:

 

• Supply and Install of Vitrified Clay (VC) Pipes for Surface Water Drainage.
• Supply and Install of Glass Reinforced Plastic (GRP) Pipes for Surface Water Drainage.
• Construction of Surface Water Manholes.
• Supply and Install of Precast Gullies.