Dukhan Road EFA Assessment and Remedial Measures Nasraniya Interchange Drainage

Client: ASHGHAL / BUZWAIR E & C

Brief Description:

• Excavation of the 300, 000 cu.m of suitable, unsuitable and rock materials.
• Disposal of the Excavated materials to approved tip off site.
• Embankments and Fillings.
• Trimming of excavated/filled surfaces of side slopes and grade areas.