South West Priority Package Infra-structure Package

Client: Education City Infrastructure

Brief Description: Execution of 10KM of Storm water network (pipe diameter from 200 to 2400mm) at depth reaching 14 meters in hrad limestone, 5 KM of Foul Sewer network (pipe diameter from 200 to 2400mm) at depth reaching 12 meters in hard limestone, 21KM of electrical 11 KV cables network, and preparing the whole area (cut 150000 M3/ fill 250000 M3) to receive roads and walkways.

Project Purpose: To make the infra-structure networks of an area exceeding 4,000,000 M2 in Qatar Foundation Education City.