The Project is part of Ports improvement in the State of Qatar by the Port Authority MWANI, in Al Wakra and Al Ruwais, consisting of:
- Installation of Pontoons
- Construction of Breakwaters
- 600,000 cbm dredging from the Seabed level up to 4 M depth
- Preparation of Bund using the excavated material
- Production of quarry run and stones from the excavated materials
- 24 hours dewatering system
CLIENT: MWANI PORT AUTHORITY